skip to Main Content

WE LOOK FORWARD TO YOUR MESSAGE

Experts with deep knowledge in Yacht charter, Marinas and Management

General Requests

Meet our Executive Team. Specialists in Yacht-Charter, Sales and Marinas
Meet our Executive Team. Specialists in Yacht-Charter, Sales and Marinas

Darius Wozniak

CEO & Founder
Marine Project GROUP
Marine Project Inc
dw(at)marine-project.com

Christa Wild

CTO & Founder
Marine Project Inc.
+49 152 54637257
cw(at)marine-project.com

Nataša Farkić

Deputy CEO
Marine Project (SRB)
+381 60 3354 449
ns(at)marine-project.com

Nico Wild

Charter Fleet Manager
Palma de Malorca (ES)
+34 635 361 563
nw(at)marine-project.com

Francois De Lafontaine

Office Seychelles
Mahé, Victoria (SYC)
+248 2514469
seychelles(at)marine-project.com

Xavier Jacqueline

Lloyd's Marine Survey
Palma de Mallorca (ES)
Victoria (SYC)
+34 692 090 097
+248 251 44 69
xj(at)marine-project.com

Christian Hausser

Marina Senior Consultant
Palma de Mallorca (ES)
+34 661 680 277
ch(at)marine-project.com

Aleksa Luković

Marina Consultant
Miami FL (USA)
Office Boston MA
+1 305 607 2237
al(at)marine-project.com

Miloš Jakšić

Products & Innovation
Novi Sad (SRB)
mj(at)marine-project.com
Meet Our Team | Marine Project

Marine Project Inc.

USA | North & South America
990 Biscayne Blvd Office 503
33132 Miami, Florida

Marine Project Charter S.L

Spain | Western Mediterranean
Carrer de Bartomeu Rosselló-Porcel, 2c
07014 Palma Balearic Islands

Marine Project Charter d.o.o

Croatia | Eastern Mediterranean
Baotic Marina Don Petra Špike 2a
21218 Seget Donji (Trogir), Croatia

Marine Project Seychelles Ltd

Seychelles | Africa & Asia
Eden Island Marina
POB 1452 Victoria

Marine Project Marketing & Management

Marketing & Management
Bulevar Evrope 36
21000 Novi Sad, Serbia
Stay in touch
Please fill in the form so that we can contact you

    Marine Project legal advisors:

    We also have in-house legal advisors, allowing us to respond quickly, independently, and cost-efficiently to any legal questions and issues from reviewing tender contract clauses. Our lawyers always speak the national language as well as English or German.

    Specialized Local Lawyers permanently working for Marine Project in:

        Portugal Lisboa
        Spain Palma
        Italy Sterzing
        England London
        Croatia Split

        Greece Alexandroupoli
        USA Miami
        Turkey Istanbul
        Seychelles Victoria

    MARINE PROJECT AT EVENTS & BOAT SHOWS

    New superyacht marina in Gibraltar nears completion

    The Marina Club, a new development of 144 waterfront rental apartments and centerpiece of the eponymous superyacht marina in Gibraltar, is nearing completion. The entire residential complex was built on mini-piles above the water and is accessible via a landscaped pier. The biggest challenge for the designers of the superyacht dock was to coordinate the design of the dock with the overall concept.

    Marina Projects of the United Kingdom designed some moorings that rest on pilings around the club and others that rest on a new floating Marinetek superyacht pontoon. All are equipped with head mooring buoys. The next phase will provide access to the club’s spa decks and facilities.

    “The construction of a world-class marina and superyacht facility in Gibraltar has been a major team effort in which I have taken great pride,” said William Bowman, marina director of Ocean Village and Marina Bay Marinas. “This development represents a massive improvement to all available marina facilities. Gibraltar has the first fully serviced berths for superyachts, and we look forward to welcoming vessels up to 90 meters [295 feet] in length.”

    The need for the marina to remain open throughout the construction period and to meet the requirements of the nearby Gibraltar Airport presented obstacles. To reduce noise and disruption to surrounding stakeholders during construction, a mini-pile system was chosen to be used throughout the facility.

    Despite the obstacles, the existing 270 berth marina was completely redesigned and rebuilt with a mix of fixed and floating Marinetek pontoons selected for their quality, durability and stability. The available water area has been used more efficiently, providing many more, longer and wider berths, better suited to the design of modern yachts. The Mediterranean berths were replaced with modern finger pontoons.

    The pile structure that will support the mooring loads for the superyacht pontoon is supported by an underwater structure that is anchored to the seabed at both ends. This means that the entire mooring system for the superyacht pontoon, along with the pontoon it supports, can be raised and removed with the tides. In normal operating mode, this intelligent technology remains hidden on the seabed.

    Gregory Butcher, chairman of the contractors, commented, “The entire project was carried out with our own teams of staff and engineers and our own civil engineering equipment, while a busy marina accompanied the entire period. Now we are ready for the next project in Gibraltar!”

    The new berths are expected to be completed by the end of the year and be operational by the beginning of 2023.

    Back To Top