Skip to content

Marina Investment | Green field

Type of sale: Green Field Project
Marina greenfield project: Design and build a marina from scratch. Each state publishes areas on which new construction of a marina is possible in principle. Marine Project develops new marinas in these locations. We prepare all relevant documents for investors until the final marina concession. This marina concession is then put out to public tender. Our clients and investors have the best chance to win the competition.

REALISATION TIME

MIN. Investment

On request

REALISATION TIME

cyba-logo_large-1.jpg
iyba-logo.jpg
marina-association-200x100-1.png

DISCLAIMER

All data provided to our clients is the result of information provided to Marine Project from a diverse database service. The accuracy of DATA provided by this website is completely determined upon information provided by third-party vendors suppliers do not warrant the precision of data, which hereby states suppliers will not be held liable whether in contract, delict, or breach of warranty for any loss or damage or damages however arising, through or out of the client (any of third party) upon placing trust on the data provided by the supplier in accordance the supplier does not obtain any liability for any fault, omission or inaccuracy in the reported provided.

TENDERING AUTHORITY?

Do you have a marina concession to re-award? Marine Project will publish your tender on our website. More participants means higher competition and higher bids. With higher revenues from the marina concession you can rehabilitate your schools and kindergartens, the higher revenues benefit everyone. We publish your tender free of charge for the benefit of your residents.

MARINA INVESTMENT OPPORTUNITY

Green Field Project Marina Vinšće
Vinišće, Croatia

Marina Details

MOORINGS
AREA
MAX. LENGHT
MAX. DRAFT
100
1.5ha
-/-
-/-

Estimate for investors

INVESTMENT VOLUME
ROI
OCCUPPANCY RATE

Estimated, depending on the required investment sum

CONCESION TIME

CURRENT CONCESSION COSTS

On request
On request
+30 Years

DEMAND

Last 3 Years

NET REVENUE

Last 3 Years

OPERATIONAL COST

Last 3 Years

PROFIT

EMPLOYEES

Location potential

Marina Municipality, with its Vinišće Marina, presents an exciting opportunity for nautical tourism development. Nestled along the picturesque Adriatic coast, Marina combines natural beauty and maritime allure. The region’s stunning landscapes, clear waters, and a Mediterranean climate that invites visitors year-round make it an ideal destination for travelers seeking an authentic Adriatic experience.
Vinišće Marina, with its planned size of 1.5 hectares and capacity for 100 moorings, holds the potential to become a thriving hub for nautical tourism. Whether it’s the captivating coastal scenery or the rich historical sites, Marina Municipality has all the elements to attract tourists from around the world.

The spatial plan envisions the adoption of an urban development plan as a prerequisite for the project’s continuation. This planning process will determine the exact location of the future marina, ensuring an organized and efficient development process.

Project description

The “Vinišće Marina” project envisions the creation of a dynamic nautical tourism destination with an anticipated capacity of approximately 100 moorings. This marina, spanning 1.5 hectares, will provide a serene setting for moored vessels.
With a sea draft ranging from 1 to 5 meters, Vinišće Marina accommodates boats and yachts of various sizes, offering flexibility for maritime enthusiasts.
The precise location of the future marina will be determined only after the adoption of the urban development plan. This approach ensures that the development aligns with local regulations and optimizes the marina’s integration into the natural surroundings.

Investors and developers are encouraged to explore the “Vinišće Marina” project, as it holds significant potential for growth and success in Marina Municipality.
This opportunity combines natural beauty, a strategic location, and a commitment to responsible development practices, making it an enticing prospect for those seeking to enter the nautical tourism sector in this captivating destination.

Project realization model

The construction and commercial use of the Vinišće nautical tourism port, i.e. the maritime property, is granted in concession for a period of 30 years, counting from the day of the conclusion of the concession contract. The concessionaire will be selected based on a public tender announced by the Ministry of the Sea, Transport and Infrastructure. Preparatory activities are being carried out for the purpose of calling for a public call for tenders for the award of a concession on maritime property.

Back To Top

Stay in touch with Marine Project

If you want to keep updated of the Marine Project latest news, special offers, investment, please take a minute and confirm your newsletter subscription today.

Marine Project Inc. will use the information you provide on this form to be in touch with you and to provide updates and marketing.
You can change your mind at any time by clicking the unsubscribe link in the